OWNER'S ENGINEERING / JAPANAn engineer on your side for energy projects in Japan.

We work for project owners, not for contractors. For companies from outside Japan that are building or investing in energy facilities here, we read the Japanese designs, quotations and regulations and tell you what they mean before you commit.
The principal spent 13 years designing, building and commissioning LNG terminal facilities at a major Japanese EPC contractor, and handles every engagement personally.

OWNER'S SIDE

We sort out the technical questions on your side before you negotiate with vendors and contractors.

SCROLL
01 / WHO WE WORK FOR

Who we work for.

Companies from outside Japan that need technical judgement on the Japanese side of a project.

An empty plant site with a surveying instrument, a layout plan and a small plant model
DEVELOPERS

Entering Japan with a plant project

Japanese designs and quotations, checked from your side.

Hands reading through stacks of quotations and drawings with a magnifying glass
INVESTORS

Looking before you invest

An independent view of the design basis, EPC price and permitting schedule.

A compressor skid in a wooden shipping crate with a blank inspection tag
SUPPLIERS

Delivering equipment to Japan

Japanese codes and inspections, worked through with your engineers.

02 / SERVICES

Services.

Scoped to the decision in front of you. A single review is fine.

  1. A high-pressure gas vessel in front of a stack of code books
    01 / REGULATORY SCREENING

    Japanese regulatory screening

    Which laws apply, such as the High Pressure Gas Safety Act, and what they mean for design and schedule. Report in English.

  2. Marked-up piping drawings with a set square and a calculator
    02 / DOCUMENT REVIEW

    Design and quotation review

    Comments on drawings, calculations and quotes, with value engineering that keeps the safety basis.

  3. A weekly meeting table with a laptop showing a schedule and drawings
    03 / EPC PMO

    EPC project management support

    Weekly tracking of design, procurement and schedule. Negotiation support in English and Japanese.

  4. A pressure vessel in a factory and a hand holding a clipboard
    04 / INSPECTION

    Inspection and commissioning

    Factory and site inspections, commissioning planning and follow-up of open items.

03 / SCOPE

What we do not do.

We would rather say this at the start than halfway through a project.

04 / ENGAGEMENT

How we work.

Remote by default, on site when it matters.

A wall calendar with the same weekday marked every week, and a laptop in a video call
TYPE A / RETAINER

Advisory retainer

A monthly hour cap agreed in advance. Weekly online meetings and asynchronous document review.

A hard hat and tool bag in front of site piping, and a single pin on a map
TYPE B / SPOT

Spot engagement

A single review, screening or inspection visit. On site only when it is needed.

Illustration of the flow of work: document review, negotiation, and a written report REVIEW / NEGOTIATION / REPORT
05 / WHY THE OWNER'S SIDE

Why we can sit
on your side.

The principal used to be on the other side of the table, writing the designs and quotations that owners receive. That is how he knows where the design margin sits in a Japanese quotation.

Information learned at previous employers and in client work is confidential and is never reused on other projects. Client names are not disclosed either.

06 / PRINCIPAL

Principal.

Thirteen years on the contractor side, then two years on the owner's side. The principal handles every engagement personally.

13YEARS / EPC
MECHANICAL DESIGN / CONSTRUCTION / COMMISSIONING

Contractor side

Thirteen years at a major Japanese engineering and construction company in mechanical design, construction and commissioning, mainly of LNG receiving terminals, calorific value adjustment units and boil-off gas compressor systems. Engineering manager on a geothermal power plant project, including coordination with overseas equipment vendors.

2YEARS / OWNER
FEASIBILITY STUDY / PROCUREMENT

Owner side

Two years on the owner's side of energy projects: new biomass fuel development, feasibility studies and cash flow models, and purchase specifications for EPC contractors.

QUALIFICATIONS
  • High Pressure Gas Production Safety Manager, Class A (Mechanical), Japanese national qualification
  • Passed the Japanese national Energy Manager examination (heat)
  • Passed the US Fundamentals of Engineering (FE) exam
07 / CONTACT

Contact

The Japanese site has more on our other work.

Company
Tokyo Kyodo Technology Co., Ltd.
東京共同技術株式会社
Address
Kinokuniya Bldg. 4F, 1-4-2 Ebisu-Minami, Shibuya-ku, Tokyo 150-0022, Japan
Facilities
Gas and liquefied gas facilities such as LNG, biomass plants, and other energy plants
Languages
English and Japanese
Information security
Information security policy (Japanese)
Privacy
Privacy policy (Japanese, with English summary)
FIRST CALL FREE OF CHARGE

One hour online to sort out the technical questions on your project.

In English or Japanese. Early-stage enquiries are welcome.